Sunday, January 26, 2014

Altus Mullanpur Flats/Apartment

Launching Residential Apartment

          
     1490 Sq Ft
                   
  3 BHK     Dining/Living Room
           
3 Washrooms        

        Kitchenette            

42.50 Lacs            

Basic Sale Price + Applicable EDC.
- See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.Ep0iflu9.dpuf


Muirwoods Eco Glades

https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEg4AlkRYBHDpqdnhCaFGA5nwJPfcth8y6gBZ_J25W-QVmmjS1fsWCcN6T-ftq6kMXEYy5VUgpw5fadiWKoT4_WvNkgfCsOu4tQ5d5S048P1BdKThdapjYqqL4L2o02W4gNcxCbVG6xp1r1_/s1600/altus+%252810%2529.jpg

At Muirwoods, Altus Space, New Chandigarh



Launching Residential Apartment

          
     1490 Sq Ft
                   
  3 BHK     Dining/Living Room
           3 Washrooms        

        Kitchenette            

42.50 Lacs            

Basic Sale Price + Applicable EDC.
The allotment of apartment unit numbers will be done through public draw system with prior intimation to the vested clients.

Technical Specifications:
Structure:
Earthquake resistant R.C.C framed structure

Living , Dining, Lobby & Passage :

Flooring  :  Vitrified /Ceramic Tiles

Walls   :  Acrylic Emulsion
Ceiling  :  Oil bound Distemper

Bedrooms :
Flooring  :  Master Bedroom—Wooden Flooring
Other Bedrooms --- Vitrified /Ceramic Tiles
Walls  :  Acrylic Emulsion
Ceiling  :  Oil bound Distemper

Kitchen :
Flooring   :   Anti skid Ceramic tiles, Counters in
Marble/Granite
Walls  :  Combination of Ceramic tiles (upto 2’0”
above counter) & Oil bound Distemper
Ceiling   :  Oil bound Distemper

Toilets :
Flooring  :   Anti skid Ceramic tiles
Walls  :  Combination of Ceramic tiles, Oil bound Distemper
Ceiling :  Oil bound Distemper

Balcony :
Flooring   :   Terrazzo tiles/ Ceramic tiles
Walls   :    Paint as per external finish

Doors & Windows :
• Internal doors polished/painted frames made of hardwood &
painted flush shutters/ moulded skin doors.
• Entrance door-Teak veneered & polished shutter/moulded skin door.
• External glazings are powder coated aluminum .

Kitchen Fittings :
Stainless steel bowl ,Sink Mixer.

Toilet Fittings :
CP fittings ,White Chinaware

Electrical Fittings :
Modular type switches & sockets ,copper wiring
(fittings like fans ,light fixtures ,geysers ,appliances
…….etc not provided).

Security System :
CCTV for podium parking and entrance lobby at GF

Elevator/Lifts :
Automatic passenger lifts.

Payment Plans


POSSESSION Linked Payment Plan
At the time of Booking
Rs. 3,00,000
On 90 Days of Booking
50 % of payments
(50% of BSP + PLC if applicable)
Less booking amount
At the time of Possession
Balance BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
FLEXI Payment Plan
At the time of Booking
Rs. 3,00,000
On 90 Days of Booking
15 % of BSP, Less booking amount
Within 5 month of Booking
7 % of BSP
Within 7 month of Booking
7 % of BSP
Within 9 month of Booking
7 % of BSP
Within 11 month of Booking
7 % of BSP
Within 13 month of Booking
7 % of BSP
Within 15 month of Booking
7 % of BSP
Within 17 month of Booking
6 % of BSP
Within 19 month of Booking
6 % of BSP
Within 21 month of Booking
6 % of BSP
Within 23 month of Booking
6 % of BSP
Within 25 month of Booking
6 % of BSP
Within 27 month of Booking
6 % of BSP
Within 29 month of Booking
6 % of BSP
At the time of Possession
Balance BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
 CONSTRUCTION LINKED Payment Plan
At the time of Booking
Rs. 3,00,000
On 90 Days of Booking
20 % of BSP, Less booking amount
On start of Construction
7.5 % of BSP
On Casting of Basement Roof
7.5 % of BSP
On Casting of 1st Floor Roof
7.5 % of BSP
On Casting of 2nd Floor Roof
7.5 % of BSP
On Casting of 3rd Floor Roof
7.5 % of BSP
On Casting of 5th Floor Roof
7.5 % of BSP + 50% PLC (if applicable)
On Casting of 8th Floor Roof
7.5 % of BSP +50 % PLC (if applicable)
On Casting of 10th Floor Roof
7.5 % of BSP
On Completion of Final Roof Slab
5 % of BSP + 100 % CMRC
On Completion of internal plaster
5 % of BSP
On Completion of Flooring Works
5 % of BSP
At the time of Possession
5 % of BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
  
            BSP       =          Basic Sale price
            PLC       =          Preferential Location Charges
            CMRC  =          Club Membership Registration Charges
IFMS     =          Interest Free Maintenance Security

Additional Cost / Other Charges

1. Basic Sale Price (BSP) Rs. ___________/- Plus Applicable EDC.
a.Preferential Location Charges :
1) Rs.1,00,000/-on 1st Floor
2) Rs.75,000/- on 2nd Floor
3) Rs.50,000/- on 3rd Floor
b. IFMS – Rs.75,000/- (One time)
c. Club Membership Registration Charges (CMRC) will be charged Rs.75,000/-
d. Power back up Charges– Rs. 20,000/- KVA (5 KVA mandatory)
e. Value Added tax (VAT) ,Stamp Duty and Registration Charges or such other taxes and /or charges present as well
as future along with any enhancement imposed or levied by the State or any competent authorities shall be
payable by the applicant only.
f. Service tax @ 3.71% or whatever is applicable & Service tax @ 12.36% on PLC, IFMS, Club Charges & Power
Back up or whatever is applicable
g. The allotment of Apartment Unit numbers will be done through Public Draw /Lottery System with prior intimation
to the vested clients.
h. Prices, terms and conditions stated herein are merely indicative with a view to acquaint the applicant and are not
exhaustive. For detailed terms and conditions please refer to the application form and Buyer's agreement.
*Tentative Super Area
NOTE :
1. Stage for each Installment shall pertain to stage for the respective building/Tower.
2. Prices subject to revision at the sole discretion of the company
3. Third party charges including Govt. charges and taxes, if applicable, shall be extra
4. Service tax @ 3.71% or whatever is applicable
5. Service tax @ 12.36% on PLC, IFMS, Club Membership Registration Charges (CMRC) &
Power Back up or whatever is applicable
6. Preferential Location Charges :
a) Rs.1,00,000/-on 1st Floor
b) Rs.75,000/- on 2nd Floor
c) Rs.50,000/- on 3rd Floor
7. Prices are subject to revision/withdrawal without notice at Company's sole discretion.
8. Prices, terms and conditions stated herein are merely indicative with a view to acquaint the applicant and
are not exhaustive. For detailed terms and conditions please refer to the application form and Buyer's agreement.
9. All payments should be made by Cheque / Demand Draft in favor of “Altus Infratech Pvt Ltd” payable
at Chandigarh.


Rush now  ! !  it is our pleasure to deliver you with the best . . . . .
Limited stock left.
For Booking and details……… 













Payment Plans

POSSESSION Linked Payment Plan
At the time of Booking
Rs. 3,00,000
On 90 Days of Booking
50 % of payments
(50% of BSP + PLC if applicable)
Less booking amount
At the time of Possession
Balance BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
FLEXI Payment Plan
At the time of Booking
Rs. 3,00,000
On 90 Days of Booking
15 % of BSP, Less booking amount
Within 5 month of Booking
7 % of BSP
Within 7 month of Booking
7 % of BSP
Within 9 month of Booking
7 % of BSP
Within 11 month of Booking
7 % of BSP
Within 13 month of Booking
7 % of BSP
Within 15 month of Booking
7 % of BSP
Within 17 month of Booking
6 % of BSP
Within 19 month of Booking
6 % of BSP
Within 21 month of Booking
6 % of BSP
Within 23 month of Booking
6 % of BSP
Within 25 month of Booking
6 % of BSP
Within 27 month of Booking
6 % of BSP
Within 29 month of Booking
6 % of BSP
At the time of Possession
Balance BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
 CONSTRUCTION LINKED Payment Plan
At the time of Booking
Rs. 3,00,000
On 90 Days of Booking
20 % of BSP, Less booking amount
On start of Construction
7.5 % of BSP
On Casting of Basement Roof
7.5 % of BSP
On Casting of 1st Floor Roof
7.5 % of BSP
On Casting of 2nd Floor Roof
7.5 % of BSP
On Casting of 3rd Floor Roof
7.5 % of BSP
On Casting of 5th Floor Roof
7.5 % of BSP + 50% PLC (if applicable)
On Casting of 8th Floor Roof
7.5 % of BSP +50 % PLC (if applicable)
On Casting of 10th Floor Roof
7.5 % of BSP
On Completion of Final Roof Slab
5 % of BSP + 100 % CMRC
On Completion of internal plaster
5 % of BSP
On Completion of Flooring Works
5 % of BSP
At the time of Possession
5 % of BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other
- See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.7BAe7ciz.dpuf
Payment Plans

POSSESSION Linked Payment Plan
At the time of Booking
Rs. 3,00,000
On 90 Days of Booking
50 % of payments
(50% of BSP + PLC if applicable)
Less booking amount
At the time of Possession
Balance BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
FLEXI Payment Plan
At the time of Booking
Rs. 3,00,000
On 90 Days of Booking
15 % of BSP, Less booking amount
Within 5 month of Booking
7 % of BSP
Within 7 month of Booking
7 % of BSP
Within 9 month of Booking
7 % of BSP
Within 11 month of Booking
7 % of BSP
Within 13 month of Booking
7 % of BSP
Within 15 month of Booking
7 % of BSP
Within 17 month of Booking
6 % of BSP
Within 19 month of Booking
6 % of BSP
Within 21 month of Booking
6 % of BSP
Within 23 month of Booking
6 % of BSP
Within 25 month of Booking
6 % of BSP
Within 27 month of Booking
6 % of BSP
Within 29 month of Booking
6 % of BSP
At the time of Possession
Balance BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other cost (if any)
 CONSTRUCTION LINKED Payment Plan
At the time of Booking
Rs. 3,00,000
On 90 Days of Booking
20 % of BSP, Less booking amount
On start of Construction
7.5 % of BSP
On Casting of Basement Roof
7.5 % of BSP
On Casting of 1st Floor Roof
7.5 % of BSP
On Casting of 2nd Floor Roof
7.5 % of BSP
On Casting of 3rd Floor Roof
7.5 % of BSP
On Casting of 5th Floor Roof
7.5 % of BSP + 50% PLC (if applicable)
On Casting of 8th Floor Roof
7.5 % of BSP +50 % PLC (if applicable)
On Casting of 10th Floor Roof
7.5 % of BSP
On Completion of Final Roof Slab
5 % of BSP + 100 % CMRC
On Completion of internal plaster
5 % of BSP
On Completion of Flooring Works
5 % of BSP
At the time of Possession
5 % of BSP + 100% of Additional cost + IFMS + Stamp duty / registration + taxes + applicable EDC + other
- See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.7BAe7ciz.dpuf
Technical Specifications:

Structure:
Earthquake resistant R.C.C framed structure
Living , Dining, Lobby & Passage :

Flooring  :  Vitrified /Ceramic Tiles

Walls   :  Acrylic Emulsion
Ceiling  :  Oil bound Distemper
Bedrooms :
Flooring  :  Master Bedroom—Wooden Flooring
Other Bedrooms --- Vitrified /Ceramic Tiles
Walls  :  Acrylic Emulsion
Ceiling  :  Oil bound Distemper
Kitchen :
Flooring   :   Anti skid Ceramic tiles, Counters in
Marble/Granite
Walls  :  Combination of Ceramic tiles (upto 2’0”
above counter) & Oil bound Distemper
Ceiling   :  Oil bound Distemper
Toilets :
Flooring  :   Anti skid Ceramic tiles
Walls  :  Combination of Ceramic tiles, Oil bound Distemper
Ceiling :  Oil bound Distemper
Balcony :
Flooring   :   Terrazzo tiles/ Ceramic tiles
Walls   :    Paint as per external finish
Doors & Windows :
• Internal doors polished/painted frames made of hardwood &
painted flush shutters/ moulded skin doors.
• Entrance door-Teak veneered & polished shutter/moulded skin door.
• External glazings are powder coated aluminum .
Kitchen Fittings :
Stainless steel bowl ,Sink Mixer.
Toilet Fittings :
CP fittings ,White Chinaware
Electrical Fittings :
Modular type switches & sockets ,copper wiring
(fittings like fans ,light fixtures ,geysers ,appliances
…….etc not provided).
Security System :
CCTV for podium parking and entrance lobby at GF
Elevator/Lifts :
Automatic passenger lifts.
- See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.7BAe7ciz.dpuf
Launching Residential Apartment

          
     1490 Sq Ft
                   
  3 BHK     Dining/Living Room
           
3 Washrooms        

        Kitchenette            

42.50 Lacs            

Basic Sale Price + Applicable EDC.
- See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.Ep0iflu9.dpuf
Muirwoods Eco Glades

At Muirwoods, Altus Space, New Chandigarh
- See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.Ep0iflu9.dpuf

Muirwoods Eco Glades

At Muirwoods, Altus Space, New Chandigarh
flats in altus mullanpur

Launching Residential Apartment

          
     1490 Sq Ft
                   
  3 BHK     Dining/Living Room
           
3 Washrooms        

        Kitchenette            

42.50 Lacs            
- See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.Ep0iflu9.dpu

Muirwoods Eco Glades

At Muirwoods, Altus Space, New Chandigarh
flats in altus mullanpur

Launching Residential Apartment

          
     1490 Sq Ft
                   
  3 BHK     Dining/Living Room
           
3 Washrooms        

        Kitchenette            

42.50 Lacs            
- See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.Ep0iflu9.dpuf
vALTUS Muirwoods Ecoglades Flats in Mullanpur New-Chandigarh - See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.Ep0iflu9.dpuf
ALTUS Muirwoods Ecoglades Flats in Mullanpur New-Chandigarh - See more at: http://www.mullanpurproperty.com/2013/11/altus-muirwoods-ecoglades-flats-in_3327.html#sthash.Ep0iflu9.dpuf

No comments:

Post a Comment